1. Commissioning

- Check that the mechanical parts of the press and the packaging have not been damaged during transport
- Secure the press to the table with the two clamps
- Insert the lever for rotating the lower roller
- Tighten the side screw with the supplied key, taking great care to fix it in the shaft cavity, ensuring that all parts are screwed and well tightened (see subsequent photos)
- Oil only the rotating mechanical parts
- Turn the pressure screws clockwise and anti-clockwise to bring the upper roller into a parallel position with the lower roller
- Remove the iron plate and clean it (NOTE: if necessary, for better traction, sand the part of the support plate in contact with the knurled lower roller to make it rougher)
- Clean the rollers with a cloth and do not oil them
- Reposition the iron plate
- Place the felt on top of the support plate
- Adjust the pressure of the press
- Perform the printing
- Once the work is finished, clean the press and store it inside its box in a dry place, thus preventing it from being damaged.
Tighten the spokes firmly. WARNING: do not start printing if all the spokes are not locked!